The Hubei EVE Energy Q8 production line aluminum profile acrylic cleanroom project consists of 10 production lines, each divided into positive and negative electrode sections (front and rear ends). Each section is further divided into upper and lower layers, resulting in a total of 40 aluminum profile acrylic cleanrooms. The cleanroom class is ISO5, equipped with an FFU group control system and temperature and humidity monitors. The project was designed and implemented by Deiiang Company, with a total cost of US$1.98 million.
Ltd. (hereinafter referred to as: YWL) was founded in 2001, in 2009 in Shenzhen GEM first batch of listing, after 23 years of rapid development, has become a globally competitive lithium battery platform company, at the same time has a consumer batteries, power batteries, storage batteries, core technology and comprehensive solutions, the products are widely used in the field of Internet of Things, the Internet of Energy. (Stock code: 300014)
This project was handled by our experienced cleanroom construction team, which consisted of 5 project managers, 15 engineers, and 40 skilled workers. All members hold relevant certifications and have received professional cleanroom construction training, ensuring project quality and timely completion.
Showcasing our latest completed projects with attention to detail and quality craftsmanship.
© 2024 Project Completion Gallery. All rights reserved.