wap_menu MENU
X
Trusted by
companies like
FLIR Logo 1
electrolux Logo 3
abb Logo 4
bmw Logo 5
i-dent Logo 6
SINOPEC Logo 7
CATL Logo 8
INOVANCE Logo 9
EVE Logo 10
HONDA Logo 11
FOXCONN Logo 12
Temperature and humidity constant clean room - outside corridor
Constant temperature and humidity clean room - side elevation photo
Temperature and humidity constant cleanroom - front elevation photo
Temperature and humidity constant clean room - outside corridor
Constant temperature and humidity clean room - side elevation photo
Temperature and humidity constant cleanroom - front elevation photo

Constant Temperature and Humidity Cleanroom

Product Description:

Deiiang Constant Temperature and Humidity Cleanrooms provide precise temperature and humidity control for pharmaceuticals, electronics, laboratories and other sensitive applications.

  • Cleanliness Class: ISO 5 - ISO 8 

  • Temperature Range: 20–24°C (Precision: ±0.5°C to ±1°C)

  • Relative Humidity: 45%–55% RH (Precision: ±2% to ±5%)

  • Indoor Positive Pressure: 10–15 Pa (Relative to adjacent lower-grade zones)

  • Filter Grade: HEPA H13 (≥99.99% @ 0.3μm)

  • Airflow Pattern: Non-unidirectional (Turbulent Flow)

  • Control System: PLC-integrated intelligent climate monitoring

  • Illumination: 300–500 Lux (Anti-glare LED Clean Lights)

  • Noise Level: ≤ 65 dB(A)

Need a Constant Temperature and Humidity Cleanroom solution?

Deiiang provides professional Constant Temperature and Humidity Cleanroom solutions

Specifications & Models

Size (W*H*D)ft Size (W*H*D)Panel MaterialISO ClassArea (㎡)Area (sq.ft)Unit PriceStock Status
2m*3m*3m6′7″*9′10″*9′10″MGO rockwoolISO86㎡64ft²106in²$5,571.00In Stock
4m*3m*3m13′1″* 9′10″*9′10″MGO rockwoolISO812㎡128ft²94in²$10,834.00In Stock
6m*3m*3m19′8″* 9′10″* 9′10″MGO rockwoolISO818㎡193ft²56in²$16,097.00In Stock
8m*3m*3m26′3″* 9′10″* 9′10″MGO rockwoolISO824㎡258ft²18in²$21,051.00In Stock
4m*5m*3m13′1″* 16′5″*9′10″MGO rockwoolISO820㎡214ft²113in²$17,771.00In Stock
6m*5m*3m19′8″* 16′5″* 9′10″MGO rockwoolISO830㎡322ft²124in²$25,800.00In Stock
8m*5m*3m26′3″* 16′5″* 9′10″MGO rockwoolISO840㎡430ft²135in²$33,257.00In Stock
10m*5m*3m32′10″* 16′5″* 9′10″MGO rockwoolISO850㎡538ft²146in²$40,143.00In Stock
5m*8m*3m16′5″* 26′3″*9′10″MGO rockwoolISO840㎡430ft²135in²$33,257.00In Stock
8m*8m*3m26′3″* 26′3″* 9′10″MGO rockwoolISO864㎡689ft²9in²$48,823.00In Stock
10m*8m*3m32′10″ * 26′3″* 9′10″MGO rockwoolISO880㎡861ft²126in²$57,143.00In Stock
2m*3m*3m6′7″*9′10″*9′10″MGOISO86㎡64ft²106in²$5,314.00In Stock
4m*3m*3m13′1″* 9′10″*9′10″MGOISO812㎡128ft²94in²$10,320.00In Stock
6m*3m*3m19′8″* 9′10″* 9′10″MGOISO818㎡193ft²56in²$15,326.00In Stock
8m*3m*3m26′3″* 9′10″* 9′10″MGOISO824㎡258ft²18in²$20,023.00In Stock
4m*5m*3m13′1″* 16′5″*9′10″MGOISO820㎡214ft²113in²$16,914.00In Stock
6m*5m*3m19′8″* 16′5″* 9′10″MGOISO830㎡322ft²124in²$24,514.00In Stock
8m*5m*3m26′3″* 16′5″* 9′10″MGOISO840㎡430ft²135in²$31,543.00In Stock
10m*5m*3m32′10″* 16′5″* 9′10″MGOISO850㎡538ft²146in²$38,000.00In Stock
5m*8m*3m16′5″* 26′3″*9′10″MGOISO840㎡430ft²135in²$31,543.00In Stock
8m*8m*3m26′3″* 26′3″* 9′10″MGOISO864㎡689ft²9in²$46,080.00In Stock
10m*8m*3m32′10″ * 26′3″* 9′10″MGOISO880㎡861ft²126in²$54,857.00In Stock
Model: DI8MGRW‑23306
Size: 2m*3m*3m
ft Size: 6′7″*9′10″*9′10″
Panel: MGO rockwool
ISO: ISO8
Area(m²): 6㎡
Area(sq.ft): 64ft²106in²
Price: $5,571.00
Stock: In Stock
Model: DI8MGRW‑43312
Size: 4m*3m*3m
ft Size: 13′1″* 9′10″*9′10″
Panel: MGO rockwool
ISO: ISO8
Area(m²): 12㎡
Area(sq.ft): 128ft²94in²
Price: $10,834.00
Stock: In Stock
Model: DI8MGRW‑63318
Size: 6m*3m*3m
ft Size: 19′8″* 9′10″* 9′10″
Panel: MGO rockwool
ISO: ISO8
Area(m²): 18㎡
Area(sq.ft): 193ft²56in²
Price: $16,097.00
Stock: In Stock
Model: DI8MGRW‑83324
Size: 8m*3m*3m
ft Size: 26′3″* 9′10″* 9′10″
Panel: MGO rockwool
ISO: ISO8
Area(m²): 24㎡
Area(sq.ft): 258ft²18in²
Price: $21,051.00
Stock: In Stock
Model: DI8MGRW‑45320
Size: 4m*5m*3m
ft Size: 13′1″* 16′5″*9′10″
Panel: MGO rockwool
ISO: ISO8
Area(m²): 20㎡
Area(sq.ft): 214ft²113in²
Price: $17,771.00
<div style="grid-column

Core components

High-strength modular frame
High-Strength Modular Framing

Industrial-grade 4080 aluminum or SUS304 stainless steel frames, precision-engineered for stability and durability. Bolt-on, tool‑less assembly enables rapid installation, while the sealed joints prevent air leakage, ensuring the integrity of the controlled environment.

Precise temperature and humidity control
Precision Temperature & Humidity Control

Integrated PID controllers with high‑accuracy sensors (±0.1°C / ±1% RH) maintain constant conditions. The system includes electric heaters, chilled water coils, and steam humidifiers, all managed via a touch‑screen interface with programmable setpoints and data logging.

High-efficiency air handling unit (AHU)
High‑Efficiency Air Handling Unit (AHU)

The AHU features EC plug fans with energy‑efficient motors, variable frequency drives, and a multi‑stage filtration section. It delivers precise airflow (0.45 m/s) while maintaining positive pressure, and is designed for low noise and minimal vibration.

H14 HEPA : U15 ULPA filters
ULPA / HEPA Filtration

H14 HEPA (or U15 ULPA) filters with 99.999% efficiency at 0.1 µm, encased in anodized aluminum frames. Filter integrity is guaranteed by in‑situ DOP/PAO scanning, and the gel‑seal design prevents any bypass, ensuring ISO 5 or better air cleanliness.

FFU fan filter unit with EC motor
Fan Filter Units (FFU) with EC Motors

Deiiang‑brand AC/EC motor FFUs provide a constant vertical airflow of 0.45 m/s. The EC motors offer stepless speed control and built‑in fault detection. FFUs are easily accessible from the ceiling grid for maintenance without disrupting the cleanroom operation.

Airtight T-shaped ceiling and wall panels
Airtight T‑Grid Ceiling & Wall Panels

The ceiling grid is designed to hold FFUs, lighting, and sprinklers without air bypass. Paired with smooth, non‑shedding wall panels (MGO or stainless steel), the system ensures zero leakage, supports differential pressure, and maintains the required cleanliness and humidity levels.

Application scenarios

Semiconductor & Electronics ISO 5 Cleanroom

Semiconductor Wafer Fabrication

Pain Point: Temp and humidity drift degrades lithography precision and wafer yield.                    
Solution:undermines wafer processing quality and production yield.Deiiang’s constant temperature and humidity clean rooms deliver tight control for stable high-yield fabrication..

Medical Device ISO 5 Assembly Line

Pharmaceutical Stability Testing

Problem: Fluctuating temp/humidity invalidates test data and risks GMP non-compliance.

Deiiang’s controlled clean rooms deliver precise steady conditions for reliable stability testing and compliance.

Pharmaceutical ISO 5 Filling Zone

Precision Metrology Calibration Labs

Challenge: Temperature shifts skew instrument readings and ruin calibration accuracy.

Our constant temp-humidity clean spaces ensure steady conditions for trustworthy calibration results.

Optical & Laser ISO 5 Environment

High-Density SMT Assembly

Problem: Humidity swings cause solder paste failure and damage sensitive components.

Our steady clean rooms support consistent SMT mounting and cut production defect rates effectively.

Biotechnology ISO 5 Research Lab

Biotech Cell Culture Research

Challenge: Unstable temp/humidity ruins cell consistency and harms research reproducibility.

Our clean rooms deliver stable conditions for reliable repeatable cell culture research.

Installation

01

Site Preparation & Survey

Inspect site, verify floor levelness and flatness, set out layout, and determine positions for equipment, doors, and windows.

⬇
02

Frame Structure Installation

Install high‑strength modular aluminum alloy frames, ensuring verticality and levelness with tolerance less than 2mm.

⬇
03

Ceiling System Installation

Install sealed T‑grid ceiling, access walkways, and mounting bases for FFUs and lighting fixtures.

⬇
04

Ductwork & HVAC Installation

Connect the constant temperature & humidity AHU, install supply/return ducts, insulation, and volume control dampers.

⬇
05

HEPA Filter & FFU Installation

Install FFU fan‑filter units with H14 HEPA filters and perform seal integrity checks.

⬇
06

Lighting & Electrical Wiring

Install LED cleanroom luminaires, route power, control cables, and grounding system.

⬇
07

Enclosure, Doors & Windows

Install anti‑static PVC curtains, tempered glass viewing windows, and air‑tight sealed doors.

⬇
08

ESD Flooring Installation

Lay anti‑static PVC flooring, connect to copper grounding grid, and verify resistivity compliance.

⬇
09

Control System Wiring & Commissioning

Complete PLC wiring, set temperature/humidity parameters (e.g., 22±1°C, 45±5% RH).

⬇
10

Validation & Cleanliness Testing

Third‑party testing for cleanliness (ISO 5), temperature, humidity, differential pressure, and illumination; issue acceptance report.

FAQ

What range of temperature and humidity control accuracy is possible in Deiiang's constant temperature and humidity cleanrooms?

Typically, Deiiang’s constant temperature and humidity cleanrooms offer ±0.5℃ temperature stability and ±3% relative humidity uniformity throughout the working zone. These cleanrooms are able to provide steady state conditions using precision sensors and variable-frequency HVAC systems. This supports sensitive processes like semiconductor lithography, precision metrology calibration, and pharmaceutical stability testing all while eliminating yield loss related to fluctuations in the environment.

Do constant temperature and humidity cleanrooms meet GMP and ISO standards?

Yes. Deiiang has designed its constant temperature and humidity cleanrooms in accordance with the requirements of GMP and ISO for pharmaceutical and medical device manufacturing and in line with ISO 14644 standards for cleanliness. Each cleanroom can go through full IQ/OQ/PQ validation with traceable calibration of sensors and performance reports that can be provided to answer the needs of regulatory audits and quality inspections.

Is it more expensive to run a constant temperature and humidity cleanroom versus a standard cleanroom?

No. Although there is some added energy load due to the precise control of the environment, Deiiang's zoning can help reduce energy consumption in conjunction with variable-frequency air handling units. With energy recovery systems and high-efficiency insulation panels, the energy load of an entire room can be reduced by almost 40%.

How many days is it possible to build a fully operational cleanroom within an existing workshop, with constant temperature and humidity control?

Most cleanrooms with temperature and humidity control are built using modular construction and prefabricated heating and cooling systems. This means a cleanroom of this type can be operational in 2 or 3 weeks. Civil engineering will likely not be required. The systems integrate rapidly into a workshop's power and water systems and are designed to interrupt a workshop's main production the least.

How is humidity and temperature control systems accuracy maintained?

Most cleanrooms require replacement of HEPA filters every 12 to 18 months. Once a month, humidifiers and dehumidifiers need cleaning, as do temperature and humidity sensors, which require calibration every three months. Our company offers a complete system inspection, including seal and fan performance inspection and control systems logic to maintain accurate, reliable operation of our cleanrooms.

How can specific manufacturing processes drive the design and construction of a cleanroom?

We design and construct cleanrooms based on the particular needs of our clients. These needs may encompass a range of environments and can include a low-temperature, low-humidity environment from SMT (surface mount technology) assembly and the production of lithium batteries to a high-temperature, high-humidity environment used for biotech cell culture and material aging. Naturally, we design and build a cleanroom based on the specific needs and conditions of a client's existing workshop.

Home

PHONE

Email

Inquiry