| Name of branch project: serial number: | ||||
| construction unit | Name of branch project | |||
| Supervision unit | Project Manager | |||
| Construction execution standard name and number | ||||
| System name | clean room grade | Test date | ||
| Test content | Testing process and instruments used | Test results | ||
| Test of air volume or wind speed in clean room | ||||
| Test of statIC pressure difference | ||||
| air filter leakage test | ||||
| Indoor air cleanliness test | ||||
| Indoor floating bacteria and settling bacteria test | ||||
| Indoor air temperature and relative humidity test | ||||
| Average speed test of clean room cross section | ||||
| Indoor noise test | ||||
| Test results | ||||
| Supervision (Construction) Unit: Professional supervision engineer: Person in charge of construction unit (project): | Construction unit: Installation project technical person in charge: Construction worker: Quality Inspector: | |||
Clean room test record form
https://www.cleanroomequips.com/Cleanroom-Testing/1910.html
MENU