MENU
X

3000 sq m SMT electronic placement workshop project in Los Angeles, Florida

This project provides a cleanroom environment that meets ISO Class 7 standards for high-end electronics manufacturing enterprises, specifically for SMT (Surface Mount Technology) electronic component assembly. The project covers a total area of ​​3,000 square meters and employs advanced air purification systems and temperature and humidity control technologies to ensure the stability and reliability of the production environment.

Project address
Los Angeles, Florida
Industry
Electronic Semiconductors
Building area
3000 square meters
ISO Class
ISO 7
Temperature
45%-65%
Humidity
24±2

Client Profile

ABC Electronics Technology Co., Ltd. is an enterprise specializing in the research and development and manufacturing of high-end electronic equipment. Its products are widely used in the communications, medical, and industrial control fields. The company boasts advanced production equipment and a professional technical team, committed to providing customers with high-quality electronic products and solutions. With business expansion and increasing production requirements, ABC Electronics has decided to build a cleanroom that meets international standards to improve product quality and production efficiency, and to meet the stringent reliability requirements of high-end customers.

Layout diagram

Phase Details

Site Preparation & Foundation

Days 1-15

Ground leveling and waterproofing treatment

Main Structure Construction

Days 16-45

Install wall panels, ceiling, and door/window systems

HVAC System Installation

Days 46-75

Install and commission FFU, ductwork, and control systems

Electrical & Systems

Days 76-105

Install electrical, lighting, monitoring systems and conduct preliminary tests

Final Commissioning

Days 106-120

Final debugging, acceptance, and training of client operators

Jiangxi Construction Engineering

This project was handled by our experienced cleanroom construction team, which consisted of 5 project managers, 15 engineers, and 40 skilled workers. All members hold relevant certifications and have received professional cleanroom construction training, ensuring project quality and timely completion.