Main steps and precautions for clean shed installation
1. Mini clean room Preparation:
Before installing the clean shed, the modular clean room must be thoroughly cleaned and wiped to ensure that there is no dust in the room. If it is necessary to install a high-efficiency filter in the technical mezzanine or ceiling, these areas must also be thoroughly cleaned.
2. mini clean room Frame construction:
The overall frame is built first, and then the wall panels and blind panels, FFU, filters, lamps, etc. are filled.
3. Mini clean room FFU installation:
The FFU system must be tested and run continuously for more than 12 hours to ensure that the system is stable before proceeding to the next step of installation.
4. High-efficiency filter installation:
Before installation, the package must be unpacked on site for appearance inspection to ensure that the filter paper, sealant and frame are not damaged and the size meets the requirements. Filters that pass the inspection should be installed immediately to avoid long-term exposure to the environment.
5. Uniform distribution:
FFU and lamps should be evenly distributed to ensure that the Clean airflow can blow to every corner and ensure the cleanliness of the shed.
6. Definition and application scenarios of clean sheds
A clean shed is a device used in areas with high local purification requirements within the operating area. It uses industrial aluminum (or stainless steel square tubes, iron square tubes sprayed with plastic) as the frame, a Fan Filter Unit (FFU) to supply air, and anti-static curtains (or tempered glass) are hung around. The internal purification level can reach 100-10000. Clean sheds are widely used in places that require high cleanliness, such as laboratories, pharmaceutical factories, food processing plants, etc.