Deiiang_Modular_Cleanroom_ISO6_Solution_EN.pdf

Jason Peng, an engineer at Deiiang Company

  • Author:Jason Peng

  • Cleanroom Engineering Technology Manager of Deiiang Company.

    Product R&D Manager of GDC Inc. Cleanroom Equipment Manufacturing Company.

    Executive Director of Guangdong Cleanroom Industry Association of China.

  • 2026-10-29  |  Visits:
12 m x 6 m x 2.5 miso 6 modular cleanroom Solution 40x40 industrial aluminum profile | Transparent PMMA wall panels | 16 ffu ceiling supplyDouble-person twin-blast air shower | MechanICal interlock pass box | Class 1,000 (1S0 14644-1class 6) / 120 air changes/h, verified to meet lSO 6 at rest / Air shower for personnel + pass box for materials, dual-zone design / 20 working days lead time,5 days on-site installation Deiiang Company|Technical Proposal V2.0 |October 2026Project dimensions: 12,000 x 6,000 x 2,500 mm |Area 72 m?| Volume 180 m3